SWPPP
  • Home
  • Accomplishments
    • Impact
    • Peer Education
    • Public Outreach
    • Maintenance
    • Structural Changes
  • About Us
  • Home
  • Accomplishments
    • Impact
    • Peer Education
    • Public Outreach
    • Maintenance
    • Structural Changes
  • About Us

STRUCTURAL IMPROVEMENTS

Simple inexpensive structural improvements

Large-scale, structural improvements

Picture
In June of 2015, the Encinitas Union School District received a $720,000  DROPS grant from the California State Water Board to implement and construct six student-led SWPPP engineering projects at five school sites. Students were involved in every step of the project including design engineering, plant selection, contractor selection and on-site construction supervision.  ​With the completion of the construction of the projects, future interns are able to assess the success of their BMPs  through continued visual observations and rain event testing.  They can compare pre-BMP results to post BMP test results data.
La Costa Heights field before project
La Costa Heights: Field Drain
​Completed 4/2018
Mission Estancia playground before project
Mission Estancia​
​
Completed 5/2018
Picture
Olivenhein Pioneer
​
​Completed 4/2018
Group photo at El Camino Creek at Groundbreaking
El Camino Creek 
​Completed 4/2017
Group photo at Flora Vista at Groundbreaking
Flora Vista 
​
Completed 4/2017
Group photo at La Costa Heights
La Costa Heights Parking Lot 
​Completed 4/2017
Picture
© COPYRIGHT 2019. ALL RIGHTS RESERVED.